How to check the quality of the construction of GCL?During the construction of the GCL, as for how to check the completion of the construction, as a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. and everyone together understand how to check the quality of the construction of the GCL!
A piece of content: whether all the overlapping parts of the GCL meet the requirements, and whether the damaged repair parts meet the requirements.
Two pieces of content: whether the repaired parts that failed the previous inspection meet the requirements, and whether the connection parts such as GCL and other equipment, foundation structure, etc. meet the requirements.
Three pieces of content: whether the location fixed by the pin meets the requirements, whether the GCL and its overlapping parts are close to the base layer without wrinkles and hangs, confirm that the GCL does not encounter water and has undergone pre-hydration, and needs pre-water treatment Whether the project is going on.
Four pieces of content: whether the backfill soil or protective layer meets the requirements, quality inspection should be carried out with the progress of construction, and the self-inspection should be subject to supervision and inspection. After acceptance, the next process can be carried out. The requirements are qualified. If the design, construction and supervision are special, they should be based on their special requirements.
Previous:How should the finished product of GCL be protected? | next:Construction notes of GCL |